The average bus between Battersea Power Station Station and Notting Hill takes 34 min and the fastest bus takes 18 min. The bus runs at least 4 times per hour from Battersea Power Station Station to Notting Hill. The journey time may be longer on weekends and holidays; use the search form on this page to search for a specific travel date.
Buses run every 15 minutes between Battersea Power Station Station and Notting Hill. The earliest departure is at 12:03 PM in the afternoon, and the last departure from Battersea Power Station Station is at 10:21 PM which arrives into Notting Hill at 10:51 PM. All services run direct with no transfers required, and take on average 34 min. The schedules shown below are for the next available departures.
Want to know about travelling from Battersea Power Station Station to Notting Hill? We have put together a list of the most frequently asked questions from our users such as: What is the cheapest mode of transport? What is the quickest option? How much do tickets usually cost? and many more.
Yes, there is a direct bus departing from Battersea Power Station Station station and arriving at Notting Hill station. Services depart every 15 minutes, and operate Once daily. The journey takes approximately 34 min.
Battersea Power Station Station to Notting Hill bus services, operated by London Buses, depart from Sopwith Way station.
Battersea Power Station Station to Notting Hill bus services, operated by London Buses, arrive at Notting Hill Gate Station.
The distance between Battersea Power Station Station and Notting Hill is 5.6 km. The road distance is 6 km.
London Buses operates a bus from Sopwith Way to Notting Hill Gate Station every 10 minutes. Tickets cost £2–4 and the journey takes 36 min.