The average train between Łódź and Elbląg takes 6h and the fastest train takes 4h 36m. The train service runs several times per day from Łódź to Elbląg. The journey time may be longer on weekends and holidays; use the search form on this page to search for a specific travel date.
Trains run every 4 hours between Łódź and Elbląg. The earliest departure is at 5:31 AM in the morning, and the last departure from Łódź is at 7:37 PM which arrives into Elbląg at 5:52 AM. All services require a transfer, and take on average 6h. The schedules shown below are for the next available departures.

4h 49m • 1 change

5h 8m • 1 change

5h 49m • 1 change
Arrives next day

10h 23m • 1 change

5h 47m • 1 change

4h 59m • 1 change

4h 49m • 1 change

5h 8m • 1 change

5h 47m • 1 change

4h 59m • 1 change

4h 49m • 1 change

5h 8m • 1 change

5h 47m • 1 change

4h 59m • 1 change

4h 49m • 1 change

5h 8m • 1 change

5h 47m • 1 change

4h 59m • 1 change

4h 49m • 1 change

5h 8m • 1 change

5h 47m • 1 change

4h 36m • 1 change

4h 49m • 1 change

5h 8m • 1 change

5h 10m • 1 change

4h 41m • 1 change

4h 41m • 1 change

5h • 1 change
Want to know about travelling from Łódź to Elbląg? We have put together a list of the most frequently asked questions from our users such as: What is the cheapest mode of transport? What is the quickest option? How much do tickets usually cost? and many more.
No, there is no direct train from Łódź to Elbląg. However, there are services departing from Łódź station and arriving at Elbląg station via Malbork. The journey, including transfers, takes approximately 6h.
Łódź to Elbląg train services, operated by PKP Intercity, depart from Lodz Fabryczna station.
Łódź to Elbląg train services, operated by PKP Intercity, arrive at Malbork station.
Book your Łódź to Elbląg train tickets online with PKP Intercity and Polregio.
The distance between Łódź and Elbląg is 264.9 km. The road distance is 435 km.
PKP Intercity operates a train from Lodz Fabryczna to Malbork hourly. Tickets cost zł 270–1,100 and the journey takes 4h 11m.