Rome2Rio

Bank Underground Station to Battersea Power Station Station trains

Find Transport to Battersea Power Station Station

View schedule

Trip Overview

The average train between Bank Underground Station and Battersea Power Station Station takes 18 min and the fastest train takes 15 min. The train runs at least 9 times per hour from Bank Underground Station to Battersea Power Station Station. The journey time may be longer on weekends and holidays; use the search form on this page to search for a specific travel date.

18 min
Duration
4 mi
Distance
£4
Average price
Every 10 minutes
Frequency

Bank Underground Station to Battersea Power Station Station train times

Trains run every 10 minutes between Bank Underground Station and Battersea Power Station Station. The earliest departure is at 12:38 AM at night, and the last departure from Bank Underground Station is at 11:02 AM which arrives into Battersea Power Station Station at 11:18 AM. All services require a transfer, and take on average 18 min. The schedules shown below are for the next available departures.

Frequently asked questions

Want to know about travelling from Bank Underground Station to Battersea Power Station Station? We have put together a list of the most frequently asked questions from our users such as: What is the cheapest mode of transport? What is the quickest option? How much do tickets usually cost? and many more.

Map of how to get from Bank Underground Station to Battersea Power Station Station.ExpandLaunch map view
  • Distance: 3.8 mi
  • Duration: 18 min

What companies run services between Bank Underground Station, England and Battersea Power Station Station, England?

You can take a subway from Bank station to Battersea Power Station station via Kennington station in around 13 min.

Operators