The average train between Battersea Power Station Station and Stepney Green Station takes 31 min and the fastest train takes 27 min. The train runs at least 9 times per hour from Battersea Power Station Station to Stepney Green Station. The journey time may be longer on weekends and holidays; use the search form on this page to search for a specific travel date.
Trains run every 10 minutes between Battersea Power Station Station and Stepney Green Station. The earliest departure is at 5:54 AM in the morning, and the last departure from Battersea Power Station Station is at 10:56 AM which arrives into Stepney Green Station at 11:24 AM. All services require a transfer, and take on average 31 min. The schedules shown below are for the next available departures.

37 min • 1 change

31 min • 1 change

30 min • 1 change

30 min • 1 change
Want to know about travelling from Battersea Power Station Station to Stepney Green Station? We have put together a list of the most frequently asked questions from our users such as: What is the cheapest mode of transport? What is the quickest option? How much do tickets usually cost? and many more.
No, there is no direct train from Battersea Power Station Station to Stepney Green Station. However, there are services departing from Battersea Power Station Station station and arriving at Stepney Green Station station via Embankment station station. The journey, including transfers, takes approximately 31 min.
Battersea Power Station Station to Stepney Green Station train services, operated by London Underground (Tube), depart from Battersea Power Station station.
Battersea Power Station Station to Stepney Green Station train services, operated by London Underground (Tube), arrive at Stepney Green station.
The distance between Battersea Power Station Station and Stepney Green Station is 8.1 km. The road distance is 11 km.
You can take a subway from Battersea Power Station station to Stepney Green station via Embankment station in around 25 min.