The average train between Battersea Power Station Station and Tooting takes 24 min and the fastest train takes 22 min. The train runs at least 9 times per hour from Battersea Power Station Station to Tooting. The journey time may be longer on weekends and holidays; use the search form on this page to search for a specific travel date.
Trains run every 10 minutes between Battersea Power Station Station and Tooting. The earliest departure is at 1:26 PM in the afternoon, and the last departure from Battersea Power Station Station is at 6:04 PM which arrives into Tooting at 6:29 PM. All services require a transfer, and take on average 24 min. The schedules shown below are for the next available departures.

25 min • 1 change

25 min • 1 change

25 min • 1 change

25 min • 1 change
Want to know about travelling from Battersea Power Station Station to Tooting? We have put together a list of the most frequently asked questions from our users such as: What is the cheapest mode of transport? What is the quickest option? How much do tickets usually cost? and many more.
No, there is no direct train from Battersea Power Station Station to Tooting. However, there are services departing from Battersea Power Station Station station and arriving at Tooting station via Kennington station station. The journey, including transfers, takes approximately 24 min.
Battersea Power Station Station to Tooting train services, operated by London Underground (Tube), depart from Battersea Power Station station.
Battersea Power Station Station to Tooting train services, operated by London Underground (Tube), arrive at Tooting Broadway Station.
The distance between Battersea Power Station Station and Tooting is 6.3 km. The road distance is 11 km.
You can take a subway from Battersea Power Station station to Tooting Broadway Station via Kennington station in around 21 min.