The average train between Chesham and Battersea Power Station Station takes 1h 26m and the fastest train takes 1h 11m. The train runs at least 2 times per hour from Chesham to Battersea Power Station Station. The journey time may be longer on weekends and holidays; use the search form on this page to search for a specific travel date.
Trains run every 30 minutes between Chesham and Battersea Power Station Station. The earliest departure is at 5:56 AM in the morning, and the last departure from Chesham is at 11:30 PM which arrives into Battersea Power Station Station at 12:53 AM. All services require a transfer at Finchley Road station and take an average of 1h 26m. The schedules shown below are for the next available departures.
Want to know about travelling from Chesham to Battersea Power Station Station? We have put together a list of the most frequently asked questions from our users such as: What is the cheapest mode of transport? What is the quickest option? How much do tickets usually cost? and many more.
No, there is no direct train from Chesham to Battersea Power Station Station. However, there are services departing from Chesham station and arriving at Battersea Power Station Station station via Finchley Road station station. The journey, including transfers, takes approximately 1h 26m.
Chesham to Battersea Power Station Station train services, operated by London Underground (Tube), depart from Chesham station.
Chesham to Battersea Power Station Station train services, operated by London Underground (Tube), arrive at Finchley Road station.
The distance between Chesham and Battersea Power Station Station is 40 km. The road distance is 51 km.
London Underground (Tube) operates a subway from Chesham station to Finchley Road station every 20 minutes. Tickets cost £20–80 and the journey takes 49 min.