The average train between Geneva and Gotthard Road Tunnel takes 5h 27m and the fastest train takes 4h 31m. There is a train service every few hours from Geneva to Gotthard Road Tunnel. The journey time may be longer on weekends and holidays; use the search form on this page to search for a specific travel date.
Trains run every 2 hours between Geneva and Gotthard Road Tunnel. The earliest departure is at 5:27 AM in the morning, and the last departure from Geneva is at 10:24 PM which arrives into Gotthard Road Tunnel at 8:44 AM. All services require a transfer at Brig and take an average of 5h 27m. The schedules shown below are for the next available departures.


5h 11m • 2 changes


4h 31m • 2 changes


4h 31m • 2 changes


4h 31m • 2 changes


5h 11m • 2 changes


4h 31m • 2 changes


4h 31m • 2 changes


4h 31m • 2 changes


5h 11m • 2 changes


4h 31m • 2 changes


4h 31m • 2 changes


4h 31m • 2 changes


5h 11m • 2 changes


4h 31m • 2 changes


4h 31m • 2 changes


4h 31m • 2 changes
Want to know about travelling from Geneva to Gotthard Road Tunnel? We have put together a list of the most frequently asked questions from our users such as: What is the cheapest mode of transport? What is the quickest option? How much do tickets usually cost? and many more.
No, there is no direct train from Geneva to Gotthard Road Tunnel. However, there are services departing from Geneva station and arriving at Gotthard Road Tunnel station via Brig. The journey, including transfers, takes approximately 5h 27m.
Geneva to Gotthard Road Tunnel train services, operated by Swiss Federal Railways (SBB CFF FFS), depart from Genève station.
Geneva to Gotthard Road Tunnel train services, operated by Swiss Federal Railways (SBB CFF FFS), arrive at Andermatt station.
Book your Geneva to Gotthard Road Tunnel train tickets online with Swiss Federal Railways (SBB CFF FFS) and Matterhorn Gotthard Bahn.
The distance between Geneva and Gotthard Road Tunnel is 194.6 km. The road distance is 274 km.
You can take a train from Genève to Gotthard Road Tunnel via Brig, Brig Bahnhofplatz, Andermatt, and Göschenen in around 5h 44m.