The average train between Greenwich and Battersea Power Station Station takes 24 min and the fastest train takes 21 min. The train runs at least 10 times per hour from Greenwich to Battersea Power Station Station. The journey time may be longer on weekends and holidays; use the search form on this page to search for a specific travel date.
Trains run every 10 minutes between Greenwich and Battersea Power Station Station. The earliest departure is at 12:06 AM at night, and the last departure from Greenwich is at 11:54 PM which arrives into Battersea Power Station Station at 12:20 AM. All services require a transfer, and take on average 24 min. The schedules shown below are for the next available departures.
Want to know about travelling from Greenwich to Battersea Power Station Station? We have put together a list of the most frequently asked questions from our users such as: What is the cheapest mode of transport? What is the quickest option? How much do tickets usually cost? and many more.
No, there is no direct train from Greenwich to Battersea Power Station Station. However, there are services departing from Greenwich station and arriving at Battersea Power Station Station station via Waterloo Station station. The journey, including transfers, takes approximately 24 min.
Greenwich to Battersea Power Station Station train services, operated by London Underground (Tube), depart from North Greenwich station.
Greenwich to Battersea Power Station Station train services, operated by London Underground (Tube), arrive at Battersea Power Station station.
The distance between Greenwich and Battersea Power Station Station is 9.5 km. The road distance is 14 km.
You can take a subway from North Greenwich station to Battersea Power Station station via Waterloo Station in around 21 min.