The average train between Marble Arch and Tooting Bec Station takes 31 min and the fastest train takes 28 min. The train runs at least 2 times per hour from Marble Arch to Tooting Bec Station. The journey time may be longer on weekends and holidays; use the search form on this page to search for a specific travel date.
Trains run every 30 minutes between Marble Arch and Tooting Bec Station. The earliest departure is at 12:07 AM at night, and the last departure from Marble Arch is at 11:52 PM which arrives into Tooting Bec Station at 12:22 AM. All services require a transfer, and take on average 31 min. The schedules shown below are for the next available departures.

28 min • 1 change

29 min • 1 change

30 min • 1 change
Arrives next day

30 min • 1 change

34 min • 1 change

3h 23m • 1 change

30 min • 1 change

35 min • 1 change

31 min • 1 change

29 min • 1 change

29 min • 1 change

30 min • 1 change
Want to know about travelling from Marble Arch to Tooting Bec Station? We have put together a list of the most frequently asked questions from our users such as: What is the cheapest mode of transport? What is the quickest option? How much do tickets usually cost? and many more.
No, there is no direct train from Marble Arch to Tooting Bec Station. However, there are services departing from Marble Arch station and arriving at Tooting Bec Station station via Tooting Bec Station station. The journey, including transfers, takes approximately 31 min.
Marble Arch to Tooting Bec Station train services, operated by London Underground (Tube), depart from Tottenham Court Road station.
Marble Arch to Tooting Bec Station train services, operated by London Underground (Tube), arrive at Tooting Bec Station.
The distance between Marble Arch and Tooting Bec Station is 8.7 km. The road distance is 12 km.
London Underground (Tube) operates a subway from Tottenham Court Road station to Tooting Bec Station every 15 minutes. Tickets cost £6–22 and the journey takes 21 min.