Rome2Rio

Putrajaya to M Design Hotel @ Seri Kembangan trains

Find Transport to M Design Hotel @ Seri Kembangan

View schedule

Trip Overview

The train between Putrajaya and M Design Hotel @ Seri Kembangan takes 8 min. The train runs at least 7 times per hour from Putrajaya to M Design Hotel @ Seri Kembangan. The journey time may be longer on weekends and holidays; use the search form on this page to search for a specific travel date.

8 min
Duration
8 km
Distance
RM 1
Average price
Every 10 minutes
Frequency

Putrajaya to M Design Hotel @ Seri Kembangan train times

Trains run every 10 minutes between Putrajaya and M Design Hotel @ Seri Kembangan. The earliest departure is at 12:40 PM in the afternoon, and the last departure from Putrajaya is at 8:50 PM which arrives into M Design Hotel @ Seri Kembangan at 8:58 PM. All services run direct with no transfers required, and take on average 8 min. The schedules shown below are for the next available departures.

Frequently asked questions

Want to know about travelling from Putrajaya to M Design Hotel @ Seri Kembangan? We have put together a list of the most frequently asked questions from our users such as: What is the cheapest mode of transport? What is the quickest option? How much do tickets usually cost? and many more.

Map of how to get from Putrajaya to M Design Hotel @ Seri Kembangan.ExpandLaunch map view
  • Distance: 7.8 km
  • Duration: 8 min

What companies run services between Putrajaya, Malaysia and M Design Hotel @ Seri Kembangan, Malaysia?

Rapid KL operates a subway from Putrajaya Sentral to Putra Permai every 10 minutes. Tickets cost RM 1–2 and the journey takes 8 min.

Operators