The average train between Stepney Green Station and Battersea Power Station Station takes 31 min and the fastest train takes 29 min. The train runs at least 9 times per hour from Stepney Green Station to Battersea Power Station Station. The journey time may be longer on weekends and holidays; use the search form on this page to search for a specific travel date.
Trains run every 10 minutes between Stepney Green Station and Battersea Power Station Station. The earliest departure is at 5:32 AM in the morning, and the last departure from Stepney Green Station is at 10:41 AM which arrives into Battersea Power Station Station at 11:12 AM. All services require a transfer, and take on average 31 min. The schedules shown below are for the next available departures.

39 min • 1 change

30 min • 1 change

34 min • 1 change

32 min • 1 change
Want to know about travelling from Stepney Green Station to Battersea Power Station Station? We have put together a list of the most frequently asked questions from our users such as: What is the cheapest mode of transport? What is the quickest option? How much do tickets usually cost? and many more.
No, there is no direct train from Stepney Green Station to Battersea Power Station Station. However, there are services departing from Stepney Green Station station and arriving at Battersea Power Station Station station via Embankment station station. The journey, including transfers, takes approximately 31 min.
Stepney Green Station to Battersea Power Station Station train services, operated by London Underground (Tube), depart from Stepney Green station.
Stepney Green Station to Battersea Power Station Station train services, operated by London Underground (Tube), arrive at Battersea Power Station station.
The distance between Stepney Green Station and Battersea Power Station Station is 8.1 km. The road distance is 11 km.
You can take a subway from Stepney Green station to Battersea Power Station station via Embankment station in around 27 min.