The average train between Stevenage and South East London Green Chain takes 1h 2m and the fastest train takes 57 min. The train runs at least 3 times per hour from Stevenage to South East London Green Chain. The journey time may be longer on weekends and holidays; use the search form on this page to search for a specific travel date.
Trains run every 20 minutes between Stevenage and South East London Green Chain. The earliest departure is at 5:13 AM in the morning, and the last departure from Stevenage is at 10:47 PM which arrives into South East London Green Chain at 11:45 PM. All services require a transfer at London Bridge and take an average of 1h 2m. The schedules shown below are for the next available departures.

1h 1m • 1 change

57 min • 1 change

1h 3m • 1 change

1h 1m • 1 change
Want to know about travelling from Stevenage to South East London Green Chain? We have put together a list of the most frequently asked questions from our users such as: What is the cheapest mode of transport? What is the quickest option? How much do tickets usually cost? and many more.
No, there is no direct train from Stevenage to South East London Green Chain. However, there are services departing from Stevenage station and arriving at South East London Green Chain station via London Bridge. The journey, including transfers, takes approximately 1h 2m.
Stevenage to South East London Green Chain train services, operated by Thameslink, depart from Stevenage station.
Stevenage to South East London Green Chain train services, operated by Thameslink, arrive at Blackheath station.
Book your Stevenage to South East London Green Chain train tickets online with Thameslink and Southeastern.
The distance between Stevenage and South East London Green Chain is 50.2 km. The road distance is 58 km.
You can take a train from Stevenage to South East London Green Chain via London Bridge and Blackheath in around 1h 7m.