Rome2Rio

Tumpat to Gua Musang trains

Find Transport to Gua Musang

View schedule

Trip Overview

The average train between Tumpat and Gua Musang takes 6h 7m and the fastest train takes 5h 44m. The train service runs several times per day from Tumpat to Gua Musang. The journey time may be longer on weekends and holidays; use the search form on this page to search for a specific travel date.

6h 7m
Duration
279 km
Distance
RM 9
Average price
3 times a day
Frequency

Tumpat to Gua Musang train times

Trains run 3 times a day between Tumpat and Gua Musang. The earliest departure is at 3:50 AM at night, and the last departure from Tumpat is at 2:40 PM which arrives into Gua Musang at 9:33 PM. All services run direct with no transfers required, and take on average 6h 7m. The schedules shown below are for the next available departures.

Frequently asked questions

Want to know about travelling from Tumpat to Gua Musang? We have put together a list of the most frequently asked questions from our users such as: What is the cheapest mode of transport? What is the quickest option? How much do tickets usually cost? and many more.

Map of how to get from Tumpat to Gua Musang.ExpandLaunch map view
  • Distance: 278.6 km
  • Duration: 6h 7m

What companies run services between Tumpat, Malaysia and Gua Musang, Malaysia?

KTM Intercity operates a train from Tumpat to Gua Musang 3 times a day. Tickets cost RM 7–40 and the journey takes 5h 46m.

Operators